Challenges of Successful Risk Management in Mega Projects

Introduction

Risk management is the process of minimizing problems that could imperil a business (Pitsis et al.). Every unplanned event that could affect the society, processes, information, and assets engaged in a venture is referred to as “risk.” Pose threats that might or might not happen, and you might not be capable of predicting if they will eventuate, contrasting ‘issues,’ that are inescapable (Uludag et al.,). Due to this uncertainty, the risk level must be planned following the plans controlled. Volatility is a fact and a substantial obstacle for most operations (Van Staveren 2018). All through the projection period, risk delivers uncertainties that influence anything from practicability to price, swing trades, profitability, and policy objectives.

Risk identification

The act of detecting and analyzing hazards to a group’s employees’ growth is known as risk assessment (Siraj, 2019). For instance, identifying information technology safety risks such as hacking and malware, catastrophes, catastrophic events, and other possible harmful occurrences that might interrupt corporate processes are all examples of hazard documentation (Oehmen 2020). There are five basic actions involved in risk identification (George, 2020). 1. Identification of threats this step’s goal is to compile a list of possible dangers to the property. Individuals including financial institutions, consumers, human resources, employees, and building maintenance might help detect dangers to a property, as per ISO 27005 (Buganova, et al., 2021). Corporate expertise, pressurized on events that have happened or earlier evaluations that were completed, should also be included, according to ISO 27005. The addition of defined risk databases is among ISO 27005’s more significant additions (Kotb, 2018). 2. Identification of assets this step aims to determine which resources are subject to the hazard analysis. This involves determining who owns the item that was discovered. Properties are classified into two main groups in ISO 27005 (Zhang et al.,). The essential processes/activities and data are the best resources. Technology, programming, connection, employees, location, and architecture are tertiary resources. 3. Identification of existing controls the goal of this task is to find out what restrictions are already in place. The ISO 27005 advice for this action is somewhat wide, and it will not expressly define management process measures or size. It does, however, give links to data sources that could be useful in this task. • Printouts of info about safeguards have been selected as trusted resources for completing this phase of the evaluation. 4. Identification of consequences this step aims to evaluate the potential harm or effects of an event simulation, also known as a risk situation in those other contexts. The ISO 27005 standard includes a set of effect variables that can be used to determine and quantify the effects. In contrast to other standards, ISO 27005 focuses on quantifying quantifiable components of effect, such as monetary purchase price and the expense of interrupted activities. 5. Identification of vulnerabilities the purpose of the operation, as the title suggests, is to discover the stock’s weaknesses (Khalilzadeh 2021). There are different samples for the identification of vulnerabilities such as interviews, code reviews, physical inspection, and document analysis.

Risk Analysis (Qualitative and Quantitative)

Risk management is the procedure of decisive the probability of a danger happening in a scheme. It examines the randomness of guidelines including how they would affect the plan’s time, performance, and prices if they materialized. Risk can be analyzed quantitatively or qualitatively (Dakkoune 2018). There seem to be a variety of risk assessment methodologies available to aid management in their assessment and judgment (Aven et al.,). Most of these need the use of assessment techniques like graphs and documentation.

Qualitative Analysis

The hazard remains a significant hazard approved out by contractors who apply information from existing initiatives and their information to evaluate the result and probability price of respectively hazard on a measure or danger grid. Typically, the grade is rated from nil to one (Gaber, 2020). That instance, if the risk’s probability of occurring in your business is.5, it has a 50percentage chance of occurring. There is now a level that goes between one and 5, with five having the greatest significant influence on the project (Fleuren et al .,). After that, the risk will be classified both as the following scenarios described 3 typical and impact (Zhang et al .,). A development colleague is recognized as risk once hazards have been discovered and evaluated.

Quantitative Analysis

Quantitative risk assessment, on the other hand, is a numerical examination of the impact of the risk assessment on the entire project (Aaron 20221). This assists professional developers and key personnel in making choices with less ambiguity and aids in risk management. Risk evaluation counts the program’s various outcomes and determines the likelihood of fulfilling the stated goals. These elements may affect, particularly even during the planning phase when there is ambiguity (Gostick et al 2019). It aids project teams in setting appropriate cost, time, and scope goals. A risk estimation technique like the Monte Carlo method is an illustration. It’s a probabilistic methodology that calculates the possibility of a danger using a computerized algorithm. It serves as a source of information for program decisions made.

Mitigation and Risk Response Development

Risk Mitigation and Vulnerability Assessments are plans implemented to reduce the likelihood of a risk occurring, as well as the consequences if it does (Wu 2018). They are a component of the risk management plan when they work jointly.

 Risk Planning

The act of recognizing, prioritizing, and controlling risk is called risk management. Each program or endeavor has an aim, or goal, that all aim to achieve (Roca et al ., 2018). These are sometimes referred to as Key Performance Indicators. After the inspection is done and examined, the mitigation and preparedness method gave a rejoinder, “What are we intending to do now?” To put it another way, after we know which risks are likely to happen and what effect they will have, the next stage is to develop plans or ways to mitigate the project’s vulnerability to such hazards in a most cost-effective way feasible. This is what PMI refers to as determining your management framework, which might be Prevent, Delegate, Ameliorate, or Embrace. An expense assessment should be undertaken on these techniques. Preventing a danger, for instance, frequently necessitates modifying the work plan. This might indicate that you are missing a critical delivery or because you’re missing a capacity that our clients demand. Shifting danger necessitates finding anyone else willing to take the risk. For instance, you may request a fixed financial quote from a supplier to reduce your price hazard; nevertheless, evidence found that all these agreements come with a cost of capital over a pricing agreement. Taking a hazard implies that you believe it is more cost-effective to bear the consequences rather than spend a fortune attempting to mitigate them.

Risk Mitigation

Risk Mitigation: As hazards are identified, certain hazards are easier avoided or accepted than others. In this case, danger minimization is investigated. The procedures of managing risk are referred to as risk reduction (Yoon 2018). You may assign funds for hazard analysis once you’ve identified the risk and its likelihood. The approach to sustainability is devising a strategy for buying down the danger. This encompasses functions with a length, price, and end dates, as well as a supervisor or acting head of the plan. A remediation schedule is created up of one or even more posts, each having its own cost, completion date, and so on. A prevention method is often a sequence of schedules that slowly lower riskiness by lowering the likelihood of an event or effect. Trials are a similar type of risk reduction measure. A set of tests on project outcomes is scheduled, which, if effective, will show that the chance of loss is lowering and the likelihood of completing on time and within the allocated is growing. If the assessments are delayed or fail, it means that something is wrong.

Effective risk mitigation entails first seeking new project risks—such as crew attrition, equipment breakdown, or project control then preparing for the danger by putting in place solutions to help mitigate or eliminate the risk (Zhu 2020). The three tactics would be used to plan and manage mitigating risk. In risk management and scheduling, five techniques may be applied. These are assuming and accepting risk, controlling risk, Avoidance of risk, Transference of risk, watch and monitoring risk.

Risk Response and Control

Effective risk control is a method of keeping hazards at the center of leadership conversations and, as a result, reviewing them on a constant schedule (Alawattegama,2018). The risk assessment will contain the following items in monitoring and managing this procedure: Closing time for the case.

Risk Response

The act of managing recognized hazards is known as risk management. It’s the first stage in every strategy. Responsibility for managing the company how or when to respond to every risk through a strategy and ruling procedure known as risk management. Positive hazards and negative dangers are the binary kinds of hazards that exist. An unfavorable risk will have a negative effect on your problematic or chance, whereas a positive danger will have a favorable one. High uncertainty is also denoted to as dangers, whereas positive risks are mentioned to as chances. All sorts of hazards must be managed to have a fruitful strategic plan. Decision-makers, on the other hand, mainly focus on undesirable risks while ignoring good ones (Yang 2020). This is not something you should be doing; instead, you ought to concentrate on controlling all sorts of problems. A negative risk can have a bad effect on your operation, therefore you’ll want to prevent or reduce the following if it happens. 1. Avoid By altering the size, strategy, or schedule, you can decrease the danger. If danger is essential and administration or the customer doesn’t want it to occur, you utilize this technique. 2. Mitigate Inside this mitigate risk management plan, you aim to reduce the risk’s likelihood of occurrence or effect. 3. Transfer this occurs If you can’t handle the danger on your own and, you employ the outsource risk treatment technique. For instance, you may be short on supplies or expertise, or you may be preoccupied with other things. 4. Escalate if you don’t have the power to supervise the danger, you utilize this mitigation strategy. To eliminate hazards, you contact your Organization or administration. You’re only responsible for overseeing the danger after they decide to handle it.

Positive risk, you’ll desire positive risks to occur since they have a favorable influence on the operation. Healthy risk approaches are contrary to potential negative approaches. The goal of a poor risk identification process is to prevent or minimize the adverse risk’s effect. Good risk management techniques, on the other side, aim to improve the likelihood of a danger happening and to recognize it if it does. Various positive strategy management tactics may be used.1. Enhance this identified risk method increases the likelihood of the danger occurring, allowing you to recognize it if it does. The enhanced risk response method is contrary to the minimized risk management plan, which aims to lower the risk’s likelihood or effect. 2. Exploit, you ensure that risk is recognized by using the exploitation identified risk technique. This is the complete antithesis of to minimize effective risk method, which involves ensuring that the danger doesn’t arise. 3. Escalate, because there is an opening but you wouldn’t have the capacity to build a reaction to achieve it, you adopt this effective risk technique. You will contact your managers to take advantage of this chance. You would not be held liable if they accept to handle the risk, however, you will record it in the identified risks for tracking purposes.

Risk Control

A risk system is defined as reviewing and controlling a company’s activities in such a way that it discovers and avoids avoidable disasters such as dangers, liabilities, and other mishaps from occurring. Modern businesses face a diverse collection of obstacles, competitors, and potential dangers (Ji 2020). Risk control is a plan-based business strategy that aims to identify, assess, and prepare for any dangers, hazards, and another potential for disaster both physical and figurative that may interfere with an organization’s operations and objectives. The core concepts of risk control include Asset protection as the most effective way, Managing risk acknowledges a danger but seeks to reduce instead of eradicating it.

Conclusion

This work analyzes the much more relevant dangers identified in the literature and demonstrates the need for more research in this area. To identify risk countermeasures and covering strategies, more study on how these hazards are addressed in massive projects is needed. To put it another way, a study is recommended with the risk assessment application’s succeeding phases quantitative risk analysis qualitative risk analysis, risk monitoring, and control, risk response planning, and. The suggested risk categorization and the remainder of the strategy might be applied to a megaproject test case in ongoing studies.

References

Aaron, J., & Chew, T. L. (2021). A guide to accurate reporting in digital image processing–can anyone reproduce your quantitative analysis?. Journal of Cell Science134(6), jcs254151.

Alawattegama, K. (2018). The impact of enterprise risk management on firm performance: Evidence from Sri Lankan banking and finance industry. International Journal of Business and Management13(1), 225-237.

Aven, T., Ben-Haim, Y., Boje Andersen, H., Cox, T., Droguett, E. L., Greenberg, M., … & Thompson, K. M. (2018, August). Society for risk analysis glossary. In Society for Risk Analysis.

Buganova, K., Luskova, M., Kubas, J., Brutovsky, M., & Slepecky, J. (2021). Sustainability of business through project risk identification with the use of expert estimates. Sustainability13(11), 6311.

Dakkoune, A., Vernières-Hassimi, L., Leveneur, S., Lefebvre, D., & Estel, L. (2018). Risk analysis of French chemical industry. Safety science105, 77-85.

Fleuren, N., Depla, M. F., Janssen, D. J., Huisman, M., & Hertogh, C. M. (2020). Underlying goals of advance care planning (ACP): a qualitative analysis of the literature. BMC palliative care19(1), 1-15.

Gaber, J. (2020). Qualitative analysis for planning & policy: Beyond the numbers. Routledge.

George, C. (2020). The Essence of Risk Identification in Project Risk Management: An Overview. International Journal of Science and Research (IJSR)9(2), 1553-1557.

Gostick, J. T., Khan, Z. A., Tranter, T. G., Kok, M. D., Agnaou, M., Sadeghi, M., & Jervis, R. (2019). PoreSpy: A python toolkit for quantitative analysis of porous media images. Journal of Open Source Software4(37), 1296.

Ji, L., Huang, G. H., Niu, D. X., Cai, Y. P., & Yin, J. G. (2020). A Stochastic Optimization Model for Carbon-Emission Reduction Investment and Sustainable Energy Planning under Cost-Risk Control. Journal of Environmental Informatics36(2).

Khalilzadeh, M., Shakeri, H., & Zohrehvandi, S. (2021). Risk identification and assessment with the fuzzy DEMATEL-ANP method in oil and gas projects under uncertainty. Procedia Computer Science181, 277-284.

Kotb, M. H., & Ghattas, M. M. (2018). Risk identification barriers in construction projects in MENA. PM World Journal7(8), 1-16.

Oehmen, J., Guenther, A., Herrmann, J. W., Schulte, J., & Willumsen, P. (2020, May). Risk management in product development: risk identification, assessment, and mitigation–a literature review. In Proceedings of the Design Society: DESIGN Conference (Vol. 1, pp. 657-666). Cambridge University Press.

Pitsis, A., Clegg, S., Freeder, D., Sankaran, S., & Burdon, S. (2018). Megaprojects redefined–complexity vs cost and social imperatives. International Journal of Managing Projects in Business.

Roca, E., Julià-Verdaguer, A., Villares, M., & Rosas-Casals, M. (2018). Applying network analysis to assess coastal risk planning. Ocean & Coastal Management162, 127-136.

Siraj, N. B., & Fayek, A. R. (2019). Risk identification and common risks in construction: Literature review and content analysis. Journal of Construction Engineering and Management145(9), 03119004.

Uludag, Ö., Kleehaus, M., Caprano, C., & Matthes, F. (2018, October). Identifying and structuring challenges in large-scale agile development based on a structured literature review. In 2018 IEEE 22nd International Enterprise Distributed Object Computing Conference (EDOC) (pp. 191-197). IEEE.

Van Staveren, M. (2018). Uncertainty and ground conditions: a risk management approach. CRC Press.

Wu, D., Li, J., Xia, T., Bao, C., Zhao, Y., & Dai, Q. (2018). A multiobjective optimization method considering process risk correlation for project risk response planning. Information Sciences467, 282-295.

Yang, T., Zhang, Q., Wan, X., Li, X., Wang, Y., & Wang, W. (2020). Comprehensive ecological risk assessment for semi-arid basin based on a conceptual model of risk response and improved TOPSIS model-a case study of Wei River Basin, China. Science of the total environment719, 137502.

Yoon, J., Talluri, S., Yildiz, H., & Ho, W. (2018). Models for supplier selection and risk mitigation: a holistic approach. International Journal of Production Research56(10), 3636-3661.

Zhang, L., Bai, W., Xiao, H., & Ren, J. (2021). Measuring and improving regional energy security: A methodological framework based on both quantitative and qualitative analysis. Energy227, 120534.

Zhang, Y., Chen, Q., Wang, R., Wang, H., Chen, Z., Li, Y., & Liu, H. (2021). A study of operational safety risk identification of a cascade reservoir group (I)——Bayesian network-based risk identification for cascade hydropower stations. Sustainable Energy Technologies and Assessments48, 101583.

Zhu, Y., & Sardana, D. (2020). Multinational enterprises’ risk mitigation strategies in emerging markets: A political coalition perspective. Journal of World Business55(2), 101044.

 

Don't have time to write this essay on your own?
Use our essay writing service and save your time. We guarantee high quality, on-time delivery and 100% confidentiality. All our papers are written from scratch according to your instructions and are plagiarism free.
Place an order

Cite This Work

To export a reference to this article please select a referencing style below:

APA
MLA
Harvard
Vancouver
Chicago
ASA
IEEE
AMA
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Need a plagiarism free essay written by an educator?
Order it today

Popular Essay Topics