Feasibility Analysis of the Site – 142–152 Broadway

Case Study Site - 142-152 Broadway, Chippendale

Context

New South Wales, Australia, may provide an alluring prospect for real estate development near 142-152 Broadway in Chippendale. Within the Sydney LGA is where the Chippendale is located (Smith, 1999). The B4 land-use zone from the Sydney Local Environmental Plan 2012 is correct for this area. In this case, the zoning permits mixed-use construction, which implies that both residential and commercial buildings may be built side by side.

Lots 1 DP443125 and 1 DP434456 make up the property. It allows for a maximum construction height of 25 meters and a Floor Area Ratio (FSR) of 6:1. These qualities, however, are limited in specific ways. This FSR satisfies the needs of the site while allowing for further expansion. Despite this, a few constraints should be considered in addition to the many opportunities.

Due to the abundance of nearby businesses and residences, residents have unprecedented convenience to many services and conveniences. When constructed, the new neighborhood will benefit from the site’s central position and closeness to Chippendale, providing access to several types of transit.

2 Design Issues, Constraints, and Opportunities for 142-152 Broadway

142-152 Broadway in Chippendale, New South Wales, has development potential but must be assessed for structural issues, restrictions, and opportunities. The location limits development height to 25 meters to fit the tight urban environment. One of the design’s primary concerns. This height offered the potential to construct a solid and attractive structure, but it had to match the existing building systems. The design must show admiration for the community’s traits.

2.1 Regulatory Issues

The term “regulatory concerns” refers to zoning rules, building ordinances, and any other restrictions mandated by the government. It is essential for the project’s approval to comprehend and abide by these requirements. In the instance of 142-152 Broadway, Chippendale, it is required to evaluate the zoning regulations in the region to decide whether or not they permit the desired development. It may be done to determine whether or not the laws allow for the intended development. Please comply with the rules to avoid astronomically expensive delays or the project’s cancellation entirely.

2.2. Land Assembly

Acquiring all required pieces of land for a planned development is referred to as “land assembly,” and it is the process through which this occurs. As the procedure often entails negotiating with many landowners, it may be difficult and time-consuming. In the case of this location, it is essential to evaluate the practicability of combining all of the necessary parcels since the project’s success might be jeopardized if even a single component is lacking.

2..3 Contractual Risks

Contractual risks are associated with agreements made with suppliers, contractors, and other stakeholders. It is of the utmost importance to ensure that contracts are well-drafted to safeguard the interests of all parties concerned. Delays, disagreements on the project’s scope, and budgetary overruns are all possibilities.

2.4Political Factors

The backing of the local government and the feelings of the community are also political factors that must be taken into account. It is vitally important to have political stability and community support for a project in order for it to be authorized. The feasibility of the project may be significantly impacted by the degree to which the local community is opposed to the project or by the degree to which government policies move.

2.5 Environmental Concerns

The role that environmental influences play in contemporary development is becoming essential. It is essential to analyze how the planned project will affect the surrounding environment and to verify that all environmental standards will be followed.

2.6 Market Timing

Market timing should be considered when doing a feasibility study. Economies and consumer tastes change over time. Assessing the consistency between projected growth and current and forecast market conditions is essential.

Data Collection

The collection of data is the first step in developing a feasibility analysis. In order to make judgments based on accurate and complete information on all pertinent parts of the project, including market research, regulatory requirements, environmental assessments, and financial forecasts, it is necessary to conduct environmental assessments.

Site Evaluation

The planned construction at 142-152 Chippendale Broadway is no exception to the rule that evaluating the site is an essential component of a successful real estate endeavor and is one of the cornerstones of this endeavor. It is vital to do an exhaustive analysis of the location and the market in the surrounding area to evaluate the practicability and potential for the endeavor’s success.

Our 142-152 Chippendale Broadway analysis was based on extensive market research. It includes setting limits, analyzing the market, and identifying opportunities. More information is being collected about residential, commercial, and mixed-use sites. Analyzing market trends, historical data, and anticipated developments reveals opportunities and threats. Gross domestic product growth, unemployment, and inflation indicate economic health.

Comparing this house to nearby comparable properties might help establish appropriate prices and attract renters. Studying sales and rental prices over time might reveal market patterns. The supply-and-demand balance determines the best project launch time. Budgeting and financial planning depend on accurate construction cost estimates and industry standards. The final Evaluation includes expected returns, development expenditures, financing costs, and a complete risk assessment to identify and manage limits and uncertainties that affect return on investment. This complete picture helps make decisions and reduce risk in real estate development.

Data Analysis

The feasibility of the Chippendale Building at 142-152 Broadway was heavily dependent on the results of the data analysis. It shows methods for determining critical indicators for data analysis and market forecasting, such as capital, sales, and rental ratios.

4.1 Ratio and predetermined capital ratio

The cap rate (capital rate) is the primary indicator of real estate investment. It shows the potential return on investment by comparing the asset’s net operating income to its market value. To calculate the expected capitalization rate, divide the estimated net operating income by the estimated asset value.

It is essential to evaluate the strengths and weaknesses of the website. It includes analyzing the market and determining the best use for the property. Consider factors such as location, demographics, and market need to determine strengths and weaknesses.

4.2Estimated revenue

Revenue forecasts can be estimated based on market analysis, rental rates, and sales prices (Pimentel, 2019). Calculate potential revenue streams for residential, commercial, or mixed-use development scenarios. Assuming we are building multi-story residential units with 50 apartments, each with an average sale price of $500,000. We assume we are leasing out 500 m² of commercial space at $200/m².

Total Projected Revenues = (50 units * $500,000/unit) + (500 m² * $200/m²)

4.3Initial development cost

Understanding development costs is critical to budgeting. Use construction cost data for various building types and levels based on total floor area. To estimate construction costs, multiply the area by the cost per square meter.

4.4 Risk and Reward Analysis

Evaluate the risk and reward profile of each design option. Consider potential risks, such as market changes or delays, and assess how they may affect the project’s financial performance. This analysis identifies and evaluates the threats that may delay the project’s conclusion. Businesses confront risks such as volatile markets, ever-evolving rules, setbacks, and monetary uncertainty. Better risk management and crisis planning may be accomplished with an in-depth familiarity with these dangers.

Better choices may be made once a thorough risk and benefit analysis has been performed. A participant’s risk tolerance and investment goals are considered when they are taught to make strategic decisions. Measuring and thoroughly examining these elements guarantees that activities and investments are made with a firm grasp of the potential consequences and associated uncertainties. Because of this, investments and initiatives have a better chance of being fruitful.

4.5 Recommendations and reports

Based on data analysis, make the most appropriate use and market strategy recommendations. Calculate the estimated remaining land value for each design alternative. Include a list of assumptions used in the analysis to ensure clarity. A thorough data analysis and market forecasting process was essential in making the right decisions regarding the development of 142-152 Broadway, Chippendale. By estimating potential revenues, costs, and benefits, performing sensitivity analysis, and assessing risk, one can create a detailed feasibility study to guide project development.

4.6 Construction cost

Construction cost data is provided to help estimate development costs. For example, considering a multi-story residential project with medium-quality finishes, the cost per square meter will be $2,455. Multiply this ratio by the project’s total square footage to estimate construction costs.

For a complete timeline, consider construction time (e.g., 7 phases in 12 months), DA approval time (12 months), and feasibility study and funding approval and design phases (12 months). It provides an approximate schedule for the project.

Construction Cost = GBA * Construction Cost per m²

Construction Cost = 5,000 m² * $2,455/m²

4.6 Finance

Assuming that the annual bank borrowing rate for development financing is 8%, this ratio can be used to estimate financing costs. Calculate financing costs based on the total financing needs of the project and the borrowing interest rate. These costs are essential to determine the financial viability of the development. Accurate construction cost data and financial assumptions are essential in evaluating the financial aspects of a project for better profits.

Assume we are developing a high-rise apartment complex with 50 flats and that each apartment will sell for $500,000. Also, let us pretend we rent out 500 square meters of retail space at $200 per square meter.

Total Projected Revenues = (50 units * $500,000/unit) + (500 m² * $200/m²)

Conclusion

The property located at 142-152 Broadway in Chippendale exhibits both prospects and challenges regarding real estate development. Mixed-use zoning is a land-use planning strategy that permits residential and commercial development to coexist within a designated area. Considering the complex interplay of political and environmental considerations, the need to balance regulatory measures, land assembly processes, and contractual risks is essential.

Data

collection and examination play a crucial role in understanding market patterns, making financial projections, and conducting risk assessments. The use of construction cost data facilitates the budgeting process, while financial assumptions play a crucial role in guiding investment decisions. Decisions are informed by a comprehensive examination of risks and benefits and a thorough market evaluation. In order to achieve success and ensure long-term viability in the ever-evolving real estate market, astute decision-making is necessary.

References

Pimentel, V., Aizezikali, A., & Baker, T. (2019). Hotel revenue management: Benefits of simultaneous overbooking and allocation problem formulation in price optimization. Computers & industrial engineering137, 106073.

Smith, R. J., & Ryan, J. S. (1999). ‘That Umbrageous Foliage’: A Study of the Prose of the North Coast of NSW to 1914.

 

Don't have time to write this essay on your own?
Use our essay writing service and save your time. We guarantee high quality, on-time delivery and 100% confidentiality. All our papers are written from scratch according to your instructions and are plagiarism free.
Place an order

Cite This Work

To export a reference to this article please select a referencing style below:

APA
MLA
Harvard
Vancouver
Chicago
ASA
IEEE
AMA
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard
Copy to clipboard