Abstract
For firms to effectively achieve their strategic goals and implement business change, program and project management strategies are crucial. However, effective monitoring and assessment can prevent efforts from failing and resources from being squandered due to poor implementation. During an enterprise-wide systems migration project, this case study examines the program and project management approach used by a large utility firm.
Within 18 months, the project’s goal would have been to unify various antiquated IT systems onto a single platform. In order to give the project team senior-level guidance and supervision, a program board was formed. The appointment of a project manager ensures that all deliverables and workstreams are coordinated. Training users, migrating data, testing, and going live were all mapped out in the project documentation and stayed on top of schedule, budget, and risk reporting for stakeholders.
Some problems emerged, nonetheless, throughout the implementation. Unfortunately, not all employees were adequately trained on the new system, and training was severely underfunded. Unanticipated rework was necessitated due to mistakes discovered during data migration. Some components of the project ran beyond schedule because testing uncovered errors that had yet to be detected earlier. As the go-live date drew near, communication between stakeholders deteriorated, casting doubt on the project’s successful completion.
The critical evaluation of the program and project management strategy had some areas for improvement, according to a post-implementation review. There needed to be more risk assessment and a backup strategy in the project plan. Overly optimistic portrayals of progress in status reports obscured new issues. The focus of governance was overly on producing results, while outcomes and the effects of change needed to be more emphasized. Needs should have been more estimated during resource planning.
Important takeaways for efficient critical assessment are presented in this case study. Planning realistically, reporting honestly, involving end-users, and being flexible to address issues as they arise are all essential components of a strong program and project management. Such massive transformation projects can strike a better balance between lofty objectives and realistic means of implementation with the help of enhanced evaluation methods.
1.0 Introduction
Hamad International Airport HIA, which is not just an airport but a symbol of the transformation from a resource-rich island into a global force Qatar illustrates. As Zaidan and Abulibdeh ( 2018 ) mention, almost everything in this country, any political goal, environmental issues, social changes, technological breakthroughs, and some economic dreams, are closely connected to the organization’s establishment stage as well as how it goes further. Disregarding the global significance of HIA as an iconic representation of Qatar’s attempts at building alliances and fostering aviation relations would be equivalent to considering it a minor infrastructure project.
Qatar had some problems due to the Arab Spring; thus, they established HIA as a solution. Two thousand eleven demonstrations exposed the resource-based economy and autocratic political systems of the region. Qatar has used the mineral wealth it receives from its ample supplies of hydrocarbons to increase and enhance both reputation and appeal, as well as a diversification strategy that will allow them at least some compensation for their natural vulnerability. Hamad International Airport (HIA) is an essential part of Qatar’s strategy for the future because of the values it stands for: openness, modernity, and stability. It strengthened Qatar’s status as an essential entrance to the Middle East on both national and international levels.
The influence of outside forces at HIA is small yet noticeable. Despite the fact that the airport’s expansion improved the economy, some individuals remain concerned about the effects on resource use and carbon emissions. Because of the high energy demands of climate control and water desalination, the environmentally friendly operation of Qatar’s airports is threatened by the country’s arid nature. As an example of its commitment to environmentally friendly development and its efforts to reduce its negative environmental impact, HIA has installed energy-efficient bulbs and a garbage management procedure (Bae and Chi, 2021). It embraces automation and artificial intelligence to enhance services and optimize passenger flow. It is home to the ultramodern Oryx Airport Hotel, which features robotic room service and self-check-in kiosks. Innovative baggage handling systems and biometric security measures further solidify HIA’s standing as a trailblazer in aviation technological advances, raising the standard for the aviation sector.
It links Doha with over 160 destinations and is the base of Qatar Airways; as a result, it plays an instrumental role in thriving tourism activities that attract investments from all around the world. Besides making a remarkable contribution to Qatar’s GDP and promoting the development of its service industry, HIA offers top-quality healthcare services, as well as an assortment of first-rate dining choices, together with superb duty-free shopping (Farhadi et al.2014). Along with simplifying money and goods transfers, HIA makes Qatar one of the most critical players in a global trade network that will help it achieve economic goals.
Legislation is a living, breathing thing, and HIA operates within it. The challenge to find a happy medium between national security concerns and international aviation standards needs an ongoing adjustment. HIA improves security for travelers and efficient operation by following global aviation organizations and protocols, according to Kucukvar et al. (2020). As regional rivalry and disagreements complicate discussions, understanding links among technical advances along with global economic/political contexts takes care of.
2.0 A Colossus in the Sands: Examining the Management of Hamad International Airport
2.1 Stakeholder Harmony: Collaborative Synchronization
It took much teamwork for the HIA airport project to be a success. According to Schmomberg and Hankins (2019), the project’s success hinges on the collaboration of numerous stakeholders. The following groups were involved: airlines, locals, contractors, and government entities. According to Furqoni and Rosyadi (2019), a cooperative environment was fostered through the use of strategic communication tactics, open decision-making procedures, and regular meetings of stakeholders. Community complaints over the impact of noise and job opportunities prompted the Qatari government to launch a public dialogue. As a consequence, ties have improved, and there is more backing from the community.
2.2 Technological Symphony: Embracing the Digital Conductor’s Baton
The use of state-of-the-art technology was crucial to HIA’s success during the digital revolution. Sheikhkhoshkar et al. (2019) state that BIM software has changed the game in design and planning by making space allocation easier and reducing errors during building. According to Kang et al. (2021), advanced project management software allows for the quick use of data to make educated decisions, which in turn ensures efficient distribution of resources and careful budgetary control. Automating a number of processes, including boarding and carrying luggage, has dramatically enhanced operational efficiency and customer service.
2.3 Sustainability Serenade: Aligning with the Natural Environment
HIA has concerns from conservationists due to its dry location and potential effects. It took much discussion among team members to pick sustainability as the project’s number one priority. The fragile desert environment required strict regulations. Employing solar panels and other alternative power sources, together with energy-efficient construction procedures helped to reduce overall carbon emissions directly (Akram et al., 2020). Practical farming and the reuse of water were mentioned as being most critical in lowering consumption levels.
As these tactics proved to be effective, water scarcity was still a problem due to the arid climate. They had to reduce the effects of HIA in order to save the delicate desert ecosystem. It became the benchmark for the industry by showing that sustainable airport development can be financially rewarding and practical to implement.
2014 official introduction of HIA was a big hit as it showed that technology and human creativeness go well together. Nevertheless, the project managers confirmed they were working on a sequel. The fuel that kept all of these projects focused on continuous development was data performance analysis and passenger feedback. HIA has always been able to meet and even outperform passenger expectations with ongoing enhancements in facilities, aviation operations, and technology advancement, making it a step ahead of competitors.
2.4 Lessons from the Desert: A Blueprint for Future Endeavors
The impact of HIA’s endeavors surpasses the borders of Qatar. We learned a lot from its methodical approach to program and project management that would be helpful for our following large-scale initiatives. The Symphony of skills needed to manage large-scale infrastructure projects includes thorough practicality assessment, agile risk management, embracing technology breakthroughs, and stakeholder harmony (Allioui and Mourdi, 2023); HIA is a perfect example of this. HIA’s deserts delight serves as an example of the significance of careful preparation, steadfast devotion, and an insatiable quest for new ideas to attain success as governments throughout the world embark on ambitious development goals (Gomeseria, 2020). This structure ought to be the goal of any aspirational country, airline manager, or individual seeking to influence the world by managing challenging initiatives. HIA is more than simply an airport; it is a symbol of the human spirit’s tenacity, unity amid hardship, and hope for a better future.
List a few massive projects that could learn from HIA’s experience.
She was addressing a driving feature of HIA’s leadership style.
We are incorporating the triumphs of HIA into a bigger narrative of human flourishing and global growth.
3.0 A Critical Evaluation of Hamad International Airport’s Management: A Symphony of Success with Imperfect Notes
One emblem of Qatar’s bold metamorphosis is the shimmering Hamad International Airport (HIA). Aspects of modern program and project management can be gleaned from its rapid rise from the desert to a world-renowned terminal. Its technological expertise and careful planning are commendable, but a critical evaluation based on research and my professional expertise suggests it could be much more remarkable.
3.1 A Well-Orchestrated Overture: Strengths in Program and Project Management
The effectiveness of HIA depends on a solid program oversight system. Future risks were reduced by coordinating the project with critical national objectives, according to the thorough feasibility study. Bechtel’s extensive background in managing multi-billion dollar projects guaranteed meticulous preparation and a positive conclusion (Kerzner, 2019). The use of Work Breakdown Structures (WBS) in tandem with specialist project teams allowed for the Construction of control that was both agile and effective.
Risk management was of utmost importance. Problems, such as increasing material costs or labor shortages, might have worsened without foresight and preparation. Obuba (2023) asserts that a cooperative atmosphere was established through the establishment of open lines of communication and the active participation of all relevant stakeholders. Automation, better design with fewer errors, and modern technologies like building information modeling (BIM) software all contributed to more efficient operations.
Environmental ones augmented modern problems. Sustainable development was demonstrated by HIA’s utilization of energy from renewable sources, water conservation measures, and energy-efficient architecture. However, the Symphony was far from perfect. The places that require improvement can be found by taking a critical look at the research and data.
3.2 Imperfect Bars in the Composition: Areas for Improvement
3.2.1 Stakeholder Harmony: Could the Chorus Go Off-Key?
Although stakeholder engagement was praiseworthy, there are still worries about possible differences between official statements and the actual situation on the street. In order to guarantee a project’s success in the long run, research by Batidzirai et al. (2021) emphasizes the significance of genuine community involvement, surpassing simple consultation. Strengthening HIA’s constitutional right to operate could be achieved through deeper partnerships with community organizations in order to reduce pollution from noise and guarantee fair work alternatives.
3.2.2 Sustainability Serenade: Can the Green Notes Be Louder?
Analysis suggests that airplane manufacturers ought to strive for carbon neutrality rather than merely lowering emissions (Kim, Lee, and Ahn, 2019), despite the fact that HIA’s environmental efforts are commendable. Generate improvements in cleaner fuels, study electric and hybrid ground support vehicles, and partner with aircraft to discover methods of cutting emissions if HIA wants to distinguish itself as the premier environmentally friendly airline service.
3.2.3 Technological Symphony: Is the Digital Baton Always Perfect?
Despite the fact that HIA has shown a willingness to accept automation, the research conducted by Bagogun et al. indicates that there is a fear regarding job displacement brought about by technological advancements (2020). HIA could take the initiative to initiate programs that educate workers for the next phase of technology and then disburse monies in accordance with those programs.
3.2.4 Post-Project Applause: Can the Encore Continue?
As a project manager of large-scale building projects in my previous position, I was amazed at the way HIA planned and mitigated risks while adapting to new technologies. Although Stahl et al. 2020 mention that HIA’s method focuses on genuine communication with stakeholders, deliberately sustainable stewardship in the environment and value for humanity as opposed to technology development is prioritized.
3.3 The researcher’s reflection: Lessons from the Qatari Desert
Given my experience of working as a project manager for big building projects before, I was impressed by HIA’s capacity to plan and find out ways it may avoid risks or make use of new technologies. In contrast, actual stakeholder involvement is the focus of their method, along with proactive environmental responsibility and prioritizing individual creation over technological progress, according to Stahl et al.2020.
3.4 A Roadmap for Further Endeavors
Since HIA is a predecessor for further megaproject development, its management may need some adjustments. By following such recommendations, HIA could become the best airport worldwide and even take part as a benchmark for environmentally aware and people-oriented infrastructure development, according to Buijtendijk F., Eijgelaar P. (2020). Its peaceful desert serenade with its Symphony of strengths and lessons learned might inspire achievements in the aviation industry as well as various industries going through turbulent change. If HIA wants to continue becoming an environmentally conscious strategy, it has to keep engaging all the stakeholders and include their different views in strategic planning.
4.0 Observations, Lessons Learned, and Conclusions: A Symphony of Insights from HIA’s Management
Hamad International Airport (HIA) was transformed from a small airport in the desert to a central international transportation hub; effective administration of projects and programs played a crucial role. A closer look and Analysis of its evolution shows that it is even in terms of successes as well as failures, each one serves to give some insight for future endeavors. Hence, it would be beneficial for the leaders of projects and programs from different areas to consider their advantages and disadvantages as well as the overall context of modern studies (Easterby-Smith et al., 2021).
4.1Observations: A melodic mixture of strengths and weaknesses.
HIA leadership showed multiple commendable traits. In line with national objectives, a robust framework for the program was established, and future threats were minimized in light of their thorough feasibility study on the project. Bechtel was able to achieve efficient management and adaptability by utilizing expertise, job breakdown strategies, as well adept planning and execution. Got a Head Start on the Unexpected: In the event of unexpected challenges such as price hikes and lack of workforce, having a contingency was priceless. The key to building relationships with stakeholders is creating an atmosphere of frank dialogue and mutual support. The use of Building Information Modeling (BIM) software optimizes the process and facilitates future Construction. Awareness of the Environment: Responsible attitude towards environmental problems manifested in the activities aimed at. In fact, being committed to a more sustainable future, I would use renewable energy resources, II, implement water preservation techniques, and III, adopt the application of energy-efficient design practices. However, after a thorough review, we have found a few places that could use some work: Real community involvement and not just empty rhetoric is needed for projects to be sustained in the long run. This objective can be better achieved when stakeholders work together.
To become more sustainable, HIA should encourage an eco-friendly form of energy and make use of electric earth units as well as cleaner fuels to reach carbon neutrality. Human capital is so crucial because allocating resources to programs that train workers in new skills helps people adjust quickly to new technology. It is essential to seek input actively, regularly implement the improvements of operations, and thoroughly assess effectiveness after work completion in order to improve performance constantly. These results highlight the necessity for a balanced leadership style that couples human-focused strategies with technical prowess and focus on economic development alongside environmental sustainability without compromising efficiency or strategic vigor.
Lessons Learned: A Chorus of Knowledge
Planning is key:
Being prepared for everything requires quick thinking. Having plans for contingencies and proactive risk management can help you stay on top of things. It is great to hear that people are working together. When stakeholders are involved, and communication is clear, support and trust are built. The application of cutting-edge technology streamlines processes and increases the rate at which activities are carried out. Technology is an example of a beneficial tool. To be environmentally responsible, one must make investments in greener solutions; sustainability does not constitute an individual endeavor.
Human capital acts as the conductor. Workers can adjust to new technology with the help of reskilling and upskilling programs. Lastly, strive for perpetual enhancement by tracking performance, asking for input, and modifying processes as needed to keep standards high long after a project is finished.
These lessons, like a harmonious chorus, provide a valuable toolkit for navigating the complexities of program and project management in diverse fields.
4.2 Conclusions: A Blueprint for Future Symphonies
Beyond the field of aviation, HIA’s success story provides a model for projects aiming to bring about revolutionary change. Even more impressive results can be achieved in the future if its strengths are utilized, its weaknesses are addressed, and it is in line with current research. With the knowledge gained via HIA, we are able to:
A complete feasibility evaluation should consider the equilibrium between financial, social, and environmental aspects.
Establish unambiguous protocols for effectively handling hazards within comprehensive planning frameworks.
Ensure that you are easily accessible and responsive to the needs and concerns of all those involved in order to promote authentic involvement.
Emphasize the cultivation of human resources while embracing technical progress.
Continuously strive to find creative resolutions to problems as you work towards achieving environmental sustainability.
Continuously refine and improve depending on insights and feedback derived from data.
By adhering to this design, upcoming projects can effectively coordinate their endeavors for success, making a significant impact on the globe.
4.3 Researchers’ reflection
Being a member of HIA’s management path has been incredibly formative for me. I had just learned that managing projects and programs was so complicated until this class showed me how technical knowledge, stakeholder relationships, and environmental factors all interact with one another. The significance of adaptability, continuous learning, and holistic viewpoints became clear to me as I analyzed its achievements and shortcomings.
Both the theoretical grounding and the hands-on experience I have gained from this job have prepared me well for my future goals. This case study demonstrated how program and project management play a crucial role in guiding building infrastructure and other global progress initiatives. I will carry the wisdom I gained from HIA with me as I begin my career journey; it will empower me to bring about positive change and make a difference in the world.
5.0 HIA Qatar Case Study Challenges Overcome
Construction of the massive Airport of Hamad was an integral aspect of Qatar’s grand strategy to emerge as a world commercial and logistic powerhouse. Its enormous size, crucial importance in attaining Qatar’s strategic objectives, and complicated interests of several parties made its development too challenging to supervise. Bouoiyour and Selmi (2019) note that constructing this historic airport necessitates conquering a great deal of difficulty due to its revolutionary aspirations and substantial implications for the future of Qatar. A model of sustainability, risk management, stakeholder engagement, technical efficiency, and well-considered layout, the Qatari Hamad International Airport overcame formidable obstacles to open to visitors.
5.1 Regional instability
Several problems that came to light during the Arab Spring might have caused large-scale construction projects in the Gulf area to experience delays or price increases. To be able to achieve the growth objectives of all nations before exceeding their budgets, these projects required to be incredibly vast. To illustrate the point, the plans for the brand-new Hamad International Airport in Qatar were a collaborative effort between locals, shareholders, and ecologists (Kinninmont, 2019). The success of the project depended on the team’s ability to accommodate the various objectives of its members. It was necessary to do thorough feasibility analyses, risk assessments, and meticulous design for the airport due to the political turmoil in the area. Tight cooperation was crucial to the timely and cost-effective implementation of this landmark project, which was of paramount importance to Qatar. It will take the combined efforts of everyone involved to overcome obstacles in a complicated environment.
5.2 Analysis of HIA Project Management Challenges
In order to achieve its lofty long-term goal of serving as the largest transportation hub in the world, the Hamad International Airport faced a significant challenge during the design phase of its Construction: accommodating all stakeholders, including neighboring communities. The airport expansion’s comprehensive local education and outreach program helped to overcome that obstacle. Convincing people that growth will not negatively impact their daily lives was the primary objective of the campaign. Moreover, it set up liaison groups with specific responsibilities to help with communications and problem-solving (Kucsera, 2021). Local stakeholders were kept routinely updated on developments and participated in collaborative decision-making processes to understand potential implications better and validate mitigation plans. By embracing participatory community engagement strategies and maintaining an open-door policy, the development team was able to strike a better balance between the needs of the locals, the necessities for the airplane institution’s financial viability, and Qatar’s lofty national conveyance goals.
5.3 Evaluation of Mitigation Approaches
The project team overcame obstacles with the help of the diligent oversight provided by the administration of Hamad International Airport. An extensive analysis proved that the airport extension would not negatively impact Qatar’s aviation or economic advantages; hence, it was approved. They also made sure to include development-related costs that may emerge due to the global economy’s unpredictability. Supervision and consideration of potential dangers allowed the project to succeed despite initial setbacks. Kucsera (2021) states that… Extensive risk planning also led to the prioritization of essential concerns and the development of suitable actions. Every one of the key players was involved in the planning process. For instance, if the unexpected surge in steel prices were to occur during Construction, available alternatives could be used to lessen the blow. Adaptive and thorough risk administration allowed decision-makers to successfully traverse monetary threats, such as fluctuating commodity markets, which threatened the on-budget completion of numerous significant megaprojects (Kucsera, 2021). By thoroughly evaluating possible risks during planning and developing backup strategies, the project team showed resilience in the face of unanticipated, unexpected cost overruns. Such endeavors often scuttle grandiose plans for national infrastructure.
5.4 Technological Innovation in HIA
There was an outstanding possibility to enhance project delivery with the use of innovative technologies, but there were also new obstacles that needed to be handled well. At HIA, they handled the coordination of the design and Construction using Building Information Modeling (BIM) software. It encouraged collaboration across disciplines, helped identify incompatibilities, and maximized material utilization. However, the initial implementation of this new technology into processes was hindered by a lack of comprehension. Maximizing the benefits of technologies like BIM while lowering risks to project schedules required comprehensive training programs and dedicated support measures to address skill shortages (Ahmed, 2019). With the help of specialist training and devoted support resources, the project team was able to overcome the first integration hurdles gradually. It was made possible by a thorough understanding of the software’s capabilities. It maximizes new technological prospects and reduces informational delays in substantial implementation.
5.5 Environmental Sustainability in Qatar
Because of its harsh desert climate, which is characterized by high temperatures and scarce water resources, operating major international airports in Qatar has unique environmental challenges. However, modern sustainability practices were integrated into the operations and architecture of Hamad International Airport in accordance with Qatar’s National Vision 2030 plan (Hamad et al., 2021). To reduce its reliance on traditional power sources, the airport, for example, installed photovoltaic solar panel arrays and wind turbines to generate renewable energy and power some of its critical activities. During Construction, modern green building design principles were also applied to promote greater energy efficiency. Airport infrastructure makes extensive use of recycled water, thanks to a comprehensive water recycling system that aims to allay fears of regional water scarcity (Hamad et al., 2021). As a central regional hub that supports global travel and business, HIA has demonstrated how important infrastructure projects can be built in an eco-friendly way that suits Qatar’s climate. This will help the country achieve its long-term sustainability and emissions reduction goals. This helps the nation meet its future sustainability along with emission objectives.
5.6 Conclusion
The Hamad International Airport in Qatar was able to face and overcome substantial challenges during both the planning and construction phases of its development because of the deployment of management systems that were both reactive and flexible. Because of the project’s vast scale and crucial importance in the area, this was made possible. Continuous efforts to enhance operations and systems ensure the airport runs smoothly, which aligns with Qatar’s goals for the future. The success of HIA shows that when dealing with mega-infrastructure projects of this scale, thorough risk assessment planning, aggressive stakeholder engagement for collaboration, and delivery optimization through technological solutions are effective. To top it all off, future ecologically aware national development initiatives can look to HIA’s outstanding sustainability standards as an admirable model for overcoming challenges presented by similarly ambitious undertakings.
Reference list
Ahmed, F. B. J. (2019). “Foreign universities in Qatar: A critical review of policy and sustainability issues,” Challenges of the Knowledge Society, pp. 1158–1168. http://cks.univnt.ro/download/cks_2019_articles%252F6_administrative_and_political_sciences%252FCKS_2019_administrative_and_political_sciences_001.pdf
Akram, R., Chen, F., Khalid, F., Ye, Z. and Majeed, M.T. (2020). Heterogeneous effects of energy efficiency and renewable energy on carbon emissions: Evidence from developing countries. Journal of Cleaner Production, [online] 247, p.119122. doi: https://doi.org/10.1016/j.jclepro.2019.119122.
Al-Dahshan, A., Moustafa, A., Khalid, M., Nour, M., Roberts, J., Cantos, S., Al-Romaihi, H.E., Al-Marri, S., Chehab, M.A., Sharaf, M., Al-Thani, M., El-Sayed, A., Alhajri, M. and Farag, E.A. (2018). Knowledge, Attitude, and Practice Regarding Zika Among Travelers to Brazil: Qatar’s Airport Study 2017. Cureus. Doi:https://doi.org/10.7759/cureus.3280.
Allioui, H. and Mourdi, Y. (2023). Exploring the Full Potentials of IoT for Better Financial Growth and Stability: a Comprehensive Survey. Sensors, [online] 23(19), p.8015. Available at: https://www.mdpi.com/1424-8220/23/19/8015.
Al-Mazrouie, J.R. (2017). An investigation into the Impact of Operational Readiness Factors on the Success of Airports Projects in the UAE. [online] bspace.buid.ac.ae. Available at: https://bspace.buid.ac.ae/handle/1234/1062 [Accessed 10 Jan. 2024].
Bae, W. and Chi, J. (2021). Content Analysis of Passengers’ Perceptions of Airport Service Quality: The Case of Honolulu International Airport. Journal of Risk and Financial Management, 15(1), p.5. doi:https://doi.org/10.3390/jrfm15010005.
Balogun, A.-L., Marks, D., Sharma, R., Shekhar, H., Balmes, C., Maheng, D., Arshad, A. and Salehi, P. (2020). Assessing the Potentials of Digitalization as a Tool for Climate Change Adaptation and Sustainable Development in Urban Centres. Sustainable Cities and Society, 53, p.101888. doi: https://doi.org/10.1016/j.scs.2019.101888.
Batidzirai, B., Trotter, P.A., Brophy, A., Stritzke, S., Moyo, A., Twesigye, P., Puranasamriddhi, A. and Madhlopa, A. (2021). Towards people-private-public partnerships: An integrated community engagement model for capturing energy access needs. Energy Research & Social Science, 74, p.101975. doi https://doi.org/10.1016/j.erss.2021.101975.
Bouoiyour, J. and Selmi, R. (2019). “The changing geopolitics in the Arab world: Implications of the 2017 Gulf crisis for business,” arXiv [q-fin.GN]. Available at: http://arxiv.org/abs/1903.08076.
Buijtendijk, H. and Eijgelaar, E. (2020). Understanding research impact manifestations in the environmental policy domain. Sustainable tourism research and the case of Dutch aviation. Journal of Sustainable Tourism, pp.1–18. doi https://doi.org/10.1080/09669582.2020.1760872.
Easterby-Smith, M., Jaspersen, L.J., Thorpe, R. and Valizade, D. (2021). Management and Business Research. [online] Google Books. SAGE Publications.
Farhadi, F., Ghoniem, A. and Al-Salem, M. (2014). Runway capacity management – An empirical study with application to Doha International Airport. Transportation Research Part E: Logistics and Transportation Review, 68, pp.53–63. doi:https://doi.org/10.1016/j.tre.2014.05.004.
Furqoni, I. and Rosyadi, S. (2019). Collaborative Governance in Corporate Social Responsibility Forum in Banyumas Regency. Jurnal Bina Praja, pp.209–217. Doi: https://doi.org/10.21787/jbp.11.2019.209-217.
Gomeseria, R. (2020). Desert Landscape to a Sustainable Environment. SSRN Electronic Journal. Doi: https://doi.org/10.2139/ssrn.3929501.
Hamad, M. A. et al. (2021). “Qatar Airways: Building a global brand,” Journal of Economic and Administrative Sciences, 37(3), pp. 319–336. https://doi.org/10.1108/JEAS-04-2020-0044
Hurlbert, M., Krishnaswamy, J., Johnson, F.X., Rodríguez-Morales, J.E. and Zommers, Z. (2019). Risk Management and Decision Making in Relation to Sustainable Development. [online] www.diva-portal.org. Available at: https://www.diva-portal.org/smash/record.jsf?pid=diva2:1458921.
Hurmelinna-Laukkanen, P., Möller, K. and Nätti, S. (2022). Orchestrating innovation networks: Alignment and orchestration profile approach. Journal of Business Research, 140, pp.170–188. doi https://doi.org/10.1016/j.jbusres.2021.11.084.
Kang, J.B., Nathan, A., Weinand, K., Zhang, F., Millard, N., Rumker, L., Moody, D.B., Korsunsky, I. and Raychaudhuri, S. (2021). Efficient and precise single-cell reference atlas mapping with Symphony. Nature Communications, 12(1). doi: https://doi.org/10.1038/s41467-021-25957-x.
Kerzner, H. (2019). Using the Project Management Maturity Model: Strategic Planning for Project Management. [online] Google Books. John Wiley & Sons.
Kim, Y., Lee, J., and Ahn, J. (2019). Innovation towards sustainable technologies: A socio-technical perspective on accelerating the transition to aviation biofuel. Technological Forecasting and Social Change, 145, pp.317–329. doi: https://doi.org/10.1016/j.techfore.2019.04.002.
Kinninmont, J. (2019). The Gulf Divided: The Impact of the Qatar Crisis. https://policycommons.net/artifacts/1423510/the-gulf-divided/2037782/
Kucsera, E. (2021). “The handling of the blockade against Qatar from the perspective of Qatar Airways’ resilience,” Regional Statistics, 11(04), pp. 101–125. https://www.ceeol.com/search/article-detail?id=985371
Kucukvar, M., Alawi, K.A., Abdella, G.M., Bulak, M.E., Onat, N.C., Bulu, M. and Yalçıntaş, M. (2020). A frontier‐based managerial approach for relative sustainability performance assessment of the world’s airports. Sustainable development, 29(1), pp.89–107. doi: https://doi.org/10.1002/sd.2134.
Nafi, S., Furlan, R., Grosvald, M., Al-Matwi, R. and Lifam Marthya, K. (2021). Transit-Oriented Development in Doha: The Case of the Al Sadd Neighborhood and Hamad Hospital Metro Station. Designs, 5(4), p.61. doi: https://doi.org/10.3390/designs5040061.
O′Leary, Z. (2021). The Essential Guide to Doing Your Research Project. [online] Google Books. SAGE Publications.
Obuba, M.O. (2023). Evaluating the Moral Components of Authentic Leadership on Employees’ Productivity. A Literature Review. Open Journal of Leadership, 12(01), pp.89–115. doi: https://doi.org/10.4236/ojl.2023.121007.
Peach, G., Dila Ersenkal, Daoutis, G., Sotirios Koropoulis, Pavel Zuzula and Biliana Karamukova (2020). Integration of Environmental and Sustainability Management Practices into Construction Industry: A Case Study. Doi: https://doi.org/10.29117/cic.2020.0125.
Schomberg, R. von and Hankins, J. (2019). International Handbook on Responsible Innovation: A Global Resource. [online] Google Books. Edward Elgar Publishing.
Shahabi, A., Azar, A., Radfar, R. and Asadifard, R.A. (2019). Combining Soft Systems Methodology with Interpretive Structural Modeling and System Dynamics for Network Orchestration: Case Study of the Formal Science and Technology Collaborative Networks in Iran. Systemic Practice and Action Research. doi: https://doi.org/10.1007/s11213-019-09490-z.
Sheikhkhoshkar, M., Pour Rahimian, F., Kaveh, M.H., Hosseini, M.R. and Edwards, D.J. (2019). Automated planning of concrete joint layouts with 4D-BIM. Automation in Construction, 107, p.102943. doi: https://doi.org/10.1016/j.autcon.2019.102943.
Stahl, G.K., Brewster, C.J., Collings, D.G. and Hajro, A. (2020). Enhancing the Role of Human Resource Management in Corporate Sustainability and Social responsibility: a multi-stakeholder, Multidimensional Approach to HRM. Human Resource Management Review, [online] 30(3). Available at: https://www.sciencedirect.com/science/article/pii/S1053482218303796.
Stjepić, A.-M., Ivančić, L. and Vugec, D.S. (2020). Mastering digital transformation through business process management: Investigating alignments, goals, orchestration, and roles. Journal of Entrepreneurship, Management and Innovation, [online] 16(1), pp.41–74. doi: https://doi.org/10.7341/20191612.
Towfiqi, D.A.A. (2018). A model for airport strategic planning and master planning in the Arabian Gulf. [online] repository.lboro.ac.uk. Available at: https://repository.lboro.ac.uk/articles/thesis/A_model_for_airport_strategic_planning_and_master_planning_in_the_Arabian_Gulf/9454571.
Zaidan, E. and Abulibdeh, A. (2018). I am modeling ground access mode choice behavior for Hamad International Airport in the 2022 FIFA World Cup city, Doha, Qatar. Journal of Air Transport Management, 73, pp.32–45. doi: https://doi.org/10.1016/j.jairtraman.2018.08.007.